Rail Type

The rail be embedded in concrete, flush with the ground, keep the integrity of the ground, also easy to clean.

The first concrete layer to the 100mm position, seting rail, then the second placement in the horizontal plane.

Seting the rail, adjust the level in the existing on the ground, and then pouring a concrete.

In the existing floor cutting 500mm wide, 100mm deep groove, and then seting rail.

Powered by MakeWebEasy.com
This website uses cookies for best user experience, to find out more you can go to our Privacy Policy  and  Cookies Policy